UCSD Medical Center | SCVC Cath Lab #3 Equipment Replacement
- Client: University of California, San Diego | UCSD Medical Center
- Location: La Jolla, CA
- Architect: Dahlin Group, Inc.
- Services/Role: GC
- Size: 829 SF
Located in the UC San Diego Sulpizio Cardiovascular Center in La Jolla, California, this project is an equipment replacement project, changing the current existing Philips Allura FD10 patient table, ceiling supported CLEA Stand and support equipment to with the new Philips Azurion7 C20 patient table, ceiling supported stand and new equipment including a UPS specifically for Cath Lab 013. The project is a “replacement-in-kind” project, with modifications only as necessary for the installation of the new equipment.