Stay connected:

Sharp Grossmont Hospital

Sharp Grossmont Hospital | Women’s Observatory Unit

A Design-Build interior renovation and Air Handler Unit 114 (AHU) replacement converting a prenatal clinic into a Women’s Observation Unit. The project included a change in license and increased the current bed count from 16 to 20 beds adding required support services so it can be longer than 23:59 hours use each day.

The space is in an HCAi-1 building which required an Alternate Means of Compliance (AMC) for the remodel of the existing six group-beds, existing patient room that were non-code compliant, a new nurse station, accessible patient toilet, shower, and upgraded mechanical, electrical, plumbing, fire alarm, fire protection system, medical gases, access control, and nurse call systems were all included.

Skip to content